This article discussed the problem of flow shop scheduling to minimize the makespan. The purpose of this article is to develop the LPT and Branch And Bound (LPT-Branch And Bound) algorithms to minimize the makespan. The proposed method is Longest Processing Time (LPT) and Branch And Bound. Stage settlement is divided into 3 parts. To proved the proposed algorithm, a numerical experiment was conducted by comparing the LPT-LN algorithm. The result of the numerical experiment shows that LPT-Branch And Bound's proposed algorithm is more efficient than the LPT-LN algorithm.
Copyrights © 2018