OPERATION EXCELLENCE: Journal of Applied Industrial Engineering
Vol 13, No 3, (2021): OE November 2021

Usulan Penerapan Metode Lean Project Management Pada Pembangunan Pelebaran Gedung Gitet Cilegon Baru PT. PLN (Persero)

Sahrupi Sahrupi (Universitas Serang Raya, Serang Jawa Barat)
Supriyadi Supriyadi (Universitas Serang Raya, Serang Jawa Barat)
Muhammad Uzan Harisni (Universitas Serang Raya, Serang Jawa Barat)



Article Info

Publish Date
30 Nov 2021

Abstract

The project construction of 2nd floors of GITET Cilegon Building at PT. PLN Persero run is not optimal. Delay is one of the waste occurs in the construction. This research aims to optimize the project construction with a lean thinking approach. Lean Project Management is a method used to obtain an optimal project schedule. Delay factors among others delay in material arrival, bad weather, and broken equipment. The highest risk potential was Acts of God and Natural Hazard such as rain, flood, or natural disasters. The recommendations for improvements to this problem are the switch of work that is material constrained, switch of work if any bad weather occurs. The results of the study obtained a time efficiency value of 33 days so that the work execution time could be accelerated to 156 days from the previous 189 days. The time efficiency contributes to project costs with an efficiency value of IDR 374.400.000.

Copyrights © 2021






Journal Info

Abbrev

oe

Publisher

Subject

Decision Sciences, Operations Research & Management

Description

The aim of Operations Excellence: Journal of Applied Industrial Engineering (OE Journal) is to publish theoretical and empirical articles that are aimed to contrast and extend existing theories, and build new theories that contribute to advance our understanding of phenomena related with industrial ...