Journal Ilmiah Rinjani : Media Informasi Ilmiah Universitas Gunung Rinjani
Vol. 3 No. 1 (2016): Journal Ilmiah Rinjani: Media Informasi Ilmiah Universitas Gunung Rinjani

ANALISA LUBANG KEPITING BINATU (Uca demani) PADA EKOSISTEM HUTAN MANGROVE TAHURA “NGURAH RAI” DESA SUWUNG KAUH, KECAMATAN DENPASAR SELATAN PROVINSI BALI

SITI WA'DAH (Unknown)



Article Info

Publish Date
09 Mar 2020

Abstract

Tujuan penelitian untuk mengetahui apakah ada perbedaan jumlah lubang kepitingantara daerah pelataran dengan pematang bekas tambak.Disamping itu juga inginmengetahui perbedaan diameter lubang diantara kedua tempat. Data hasilpenghitungan jumlah dan pengukuran diameter lubang kepiting bakau, ditabulasi dandirata-ratakan masing-masing transek untuk selanjutnya dilakukan analisa data denganmelakukan uji t berpasangan (t-test two pairs). Hasil penelitian mendapatkan tidakterdapat perbedaan yang nyata jumlah lubang kepiting pada daerah pematang yangmiring dengan daerah pelataran yang datar. Tidak terdapat perbedaan yang nyataperbedaan diameter lubang kepiting pada daerah pematang dan daerah pelataran.Jumlah lubang kepiting yang ditemukan pada daerah sisi miring pematang rata-rata 51lubang/transek atau 204 lubang/m2 dengan rata-rata diameter lubang sebesar 1,94 cm,sedangkan pada daerah pelataran ditemukan sebanyak 41 lubang/transek atau 164lubang/m2 dengan rata-rata diameter lubang sebesar 2,17 cm.Kata Kunci: Analisa Lubang Kepiting BinatuThe purpose from research is to find out whether there are differences between theamount of crab holes court of the former dike embankment. It also wanted to know thedifference between the spot diameter hole. Data calculation and measurement of thediameter of the hole crab, tabulated and averaged each transect to further analyze thedata by performing a paired t test (t-test two pairs). The results of a study reported thatthere was no significant difference in the amount of crab holes sloping embankmentarea with a flat yard area. There was no significant difference crab hole diameterdifference on the dike and district courts. Amount of crab holes were found on the sideof the sloping embankment on average 51 hole / transect or 204 holes / m2 with anaverage diameter of 1.94 cm, while in the district court found as many as 41 holes /transect or 164 holes / m2 an average of 2.17 cm diameter hole.Keywords: Analysis of Crab Hole Uca demani

Copyrights © 2020