Analisis Percepatan Proyek Menggunakan Metode Crashing Dengan Penambahan Jam Kerja Empat Jam dan Sistem Shift Kerja (Studi Kasus : Proyek Pembangunan Gedung RSUB Malang)

Ridwan, Ahmad (Unknown)



Article Info

Publish Date
01 Sep 2020

Abstract

In the process of building a construction project, work delays often occur on the project. So we need an alternative that can be used to support the acceleration of project completion. In this study, we will analyze the acceleration of duration in the construction project of RSUB Malang Building, with the alternative of adding four hours of work and the work shift system (morning shift and night shift). The total project cost budget in post-crashing conditions with the alternative of additional working hours was Rp.12,312,448,567.00 or more expensive 0.82% of the total project cost budget under normal conditions and the duration of project implementation was 191 working days or faster 9, 05% of the normal duration, while the total project budget in conditions after crashing with an alternative work shift system was Rp. 12,155,175,517.00 or 0.47% cheaper than the total project cost budget under normal conditions and the duration of project implementation was 179 days or 14.76% faster than the normal duration. It can be concluded that implementing a work shift system is a more effective and economical alternative to crashing, because the duration is faster and the total project cost budget is cheaper.

Copyrights © 2020






Journal Info

Abbrev

jurnal

Publisher

Subject

Computer Science & IT Decision Sciences, Operations Research & Management Economics, Econometrics & Finance Engineering Social Sciences Transportation

Description

The Jurnal Aplikasi Pelayaran dan Kepelabuhanan contains scientific writings in the fields of shipping, ship machinery, port management, and transportation, all of which are the result of research or literature ...