Pola Operasi Waduk Wonogiri Setelah Pembangunan Pintu Pelimpah Baru Untuk Pengendalian Banjir

Wijayanti, Paska (Unknown)
Istiarto, Istiarto (Unknown)
Jayadi, Rachmad (Unknown)



Article Info

Publish Date
30 Dec 2021

Abstract

Wonogiri reservoir in upstream Bengawan Solo experienced sedimentation problems that endanger its operation. Much of sediments come from Keduang watershed. To overcome this problem, closure dike was constructed to localize the sediment from Keduang watershed. The dike divides the reservoir into main and sediment storage reservoirs, each has its spillway. This paper presents results of the study on Wonogiri Reservoir operation during flood period after dike construction. The study followed a two-step calculation. It updated the design flood by employing rainfall data frequency analysis and Collins unit hydrograph. Flood routing was subsequently done by applying level pool method. Two conditions were considered, namely existing condition whose initial water level was +135.3 meters and new condition whose initial water level was +136.3 meters. The study reveals an increase of the flood discharge to Wonogiri reservoir by 7.7% and 3.6% for the 60 year and 500 year floods, respectively, as compared to the previous study of Pradipta (2014). The study shows that Wonogiri reservoir is prone to overtopping under 500 year flood. It is recommended to lower the control water level of the new spillway.

Copyrights © 2021






Journal Info

Abbrev

mkts

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Media Komunikasi Teknik Sipil (ISSN 0854-1809) published twice in a year, in July and December. The article can be product of researches, scientific thoughts or case study, in civil engineering and isn’t formed by politics, commercialism, and subjectivity unsure. This scientific journal ...