ANALISA PENJADWALAN PROYEK DENGAN METODE PERT DAN CPM PADA PEMBANGUNAN GEDUNG HOTEL DI SIDOARJO

Moch Syamsul Maarif (Universitas Muhammadiyah Surabaya)



Article Info

Publish Date
31 May 2022

Abstract

The probability of the project being completed on time or according to plan with PERT and CPM methods with Microsoft Project Application is 66%. From the distribution of questionnaires to 26 respondents, it can be concluded that the 3 main factors causing delays in the hotel building project in Sidoarjo, project delays are due to technical factors with a preset value of 87.85%, project delays due to financial factors with a preset value of 77.31%, project delays due to labor and equipment factors with a preset value of 71.03%.

Copyrights © 2022






Journal Info

Abbrev

agregat

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Engineering Transportation

Description

AGREGAT is a journal of Department of Civil Engineering, University of Muhammadiyah Surabaya. The journal will be published in every May and November yearly. The journal consists of result of research, literature review, and case reports created as realization of Tridharma ...