International Journal Engineering and Applied Technology (IJEAT)
Vol. 4 No. 1 (2021): International Journal of Engineering and Applied Technology (IJEAT)

Performance Analysis of 3 Arms Without Signal Access (Case Study Jl. Raya Bogor-Sukabumi, Jl. Siliwangi-Cibolang, Jl. Perintis Kemerdekan)

Nurul Aen (Unknown)
Daniel Ari Susanto (Universitas Nusa Putra)
Dio Damas Permadi (Universitas Nusa Putra)
Isaeva Tatyana Evgenevna (Rostov State Transport University)



Article Info

Publish Date
29 May 2021

Abstract

One of the types of intersections is the type of unsignalized intersection, the unsignalized intersection which is on Jl. Raya Bogor-Sukabumi, Jl. Siliwangi- cibolang, Jl. Independence pioneer. is the intersection of three arms. This study aims to determine the value of cur/hour and the performance of unsignalized intersections at the intersection. This research method is a field survey, which is carried out by researching directly in the field to obtain the required data. calculation of unsignalized intersection performance data using the 1997 Indonesian Highway Capacity manual method. Results the analysis obtained, the value of capacity from seven days of observation obtained a value of….cur/hour, the value of the degree of saturation DJ=….., too high occurred on the day… at WIB and the value of the delay is obtained by…. sec/cur. The queue probability value ranges from….% -….%

Copyrights © 2021






Journal Info

Abbrev

IJEAT

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Computer Science & IT Electrical & Electronics Engineering Engineering Mechanical Engineering

Description

IJEAT publishes original papers only and the submission of a manuscript will be taken to imply that the contributions are original and that no similar manuscript has been or is being submitted to other journals. Manuscripts are solicited from all areas of specialization in engineering. IJEAT is an ...