JURNAL TEKNIK INDUSTRI
Vol. 3 No. 2 (2013): Volume 3 No 2 Juli 2013

EVALUASI DAN USULAN PERBAIKAN KESEIMBANGAN LINTASAN PRODUKSI UNTUK MENCAPAI TARGET PRODUKSI DENGAN PENDEKATAN SIMULASI PADA WORKSHOP 3 DI PT. FACO GLOBAL ENGINEERING

Reza Primadhana (Unknown)
Parwadi Moengin (Unknown)
Sucipto Adisuwiryo (Unknown)



Article Info

Publish Date
01 Jul 2013

Abstract

PT. FACO Global Engineering is a national company that manufactures Transformer Tank.The problems that arise on the production floor in Workshop 3 is a common difficulty in achievingproduction targets precisely at the appointed time this problem may be related to its unbalancedproduction line .. Average yield Transformer Tank produced today is 1 unit per week, while theproduction target set is 2 units per week.The methodology used is to use the simulation. The data obtained was then calculated andanalyzed the workload of each station. Utility work station is currently the largest existing utilities inthe workstation and welding with a cutting wheel percentages respectively 91.65% and 76.45%. Forutility work station is the smallest percentage of work stations fullfitting with 3.76%. This can beovercome by the proposed model are given 6. Model 2 the best proposal is the transfer station operatorto work painting and cutting wheel 1 fullfitting operator work station to drilling.

Copyrights © 2013






Journal Info

Abbrev

tekin

Publisher

Subject

Electrical & Electronics Engineering Energy Industrial & Manufacturing Engineering

Description

Jurnal Teknik Industri (JTI) mainly focuses on industrial engineering scientific essays in the form of research results, surveys and literature review that are closely related to the Field of Industrial ...