JURNAL TEKNIK INDUSTRI
Vol. 2 No. 1 (2012): Volume 2 No 1 Maret 2012

SEBUAH MODEL PEMROGRAMAN BILANGAN BULAT UNTUK PENYELESAIAN MASALAH PENJADWALAN SUMBER MAJEMUK PARALEL SIMULTAN

Parwadi Moengin (Unknown)
Felia Indah Kusuma (Unknown)



Article Info

Publish Date
17 Mar 2012

Abstract

Manufacturing company engaged in textile manufacturing in the Job Order system with an extensive network and market orientation requires more attention to the quality of products and services that meet customer requirements, one of them by way of the fulfillment of an order at the time agreed in advance. The problems are often found in the companies are delays in the completion of orders. This is due to less optimal job scheduling order by weight or penalty different on each job which will ultimately lead to the total weighted delay of the delay comes from the accumulation of a different job with the weights. This paper is intended to help companies create a new and more optimal scheduling in order to minimize the total weighted delay in the completion of order.The model used in this paper is an integer linear programming model for resource-scheduling problem for multiple simultaneous parallel job-compound and compound-operation. The initial steps of the use of this model is the formulation of the decision variables, and the objective function is minimizing total weighted tardiness or delay subject to the limiting functions. Software used in the processing of this data is WinQSB. At the end of the text is given a numerical example using the proposed model.

Copyrights © 2012






Journal Info

Abbrev

tekin

Publisher

Subject

Electrical & Electronics Engineering Energy Industrial & Manufacturing Engineering

Description

Jurnal Teknik Industri (JTI) mainly focuses on industrial engineering scientific essays in the form of research results, surveys and literature review that are closely related to the Field of Industrial ...