Aptisi Transactions on Technopreneurship (ATT)
Vol 4 No 2 (2022): July

Preventive Maintenance Scheduling with Age Replacement Method at CNG Station

Bangun, Cicilia (Unknown)
Jalil, Abdul (Unknown)
Amperajaya, Derajat (Unknown)
Rasjidin, Roesfiansjah (Unknown)



Article Info

Publish Date
21 Jul 2022

Abstract

CNG Mother Station focused to distribute Compressed Natural Gas for various industries. In the period from December 2020 to November 2021, there were 40 breakdowns in the distribution process machine causing delays in distribution of CNG. Company has to pay attention to the maintenance scheduling for vulnerabl components. This study aims to determine Preventive Maintenance scheduling and calculating maintenance costs using Age Replacement method for the critical components. The results showed that the critical components are Air Supply’s Hose (ASH) and Double Nipple Stage 4 (DNS-4). The proposed optimal replacement time interval for the ASH is 20 days where 19 component replacements are scheduled in 1 year with a cost reduction up to 4.8% compared to existing. The optimal replacement time interval for DNS-4 components is 24 days, which is scheduled for 16 component replacements in 1 year with cost reduction up to 29.1% compared to existing.

Copyrights © 2022






Journal Info

Abbrev

att

Publisher

Subject

Humanities Computer Science & IT Economics, Econometrics & Finance Education Social Sciences

Description

APTISI Transactions on Technopreneurship (ATT) is an international triannual open access scientific journal published by  Pandawan Sejahtera Indonesia. ATT publishes original scientific researchers from scholars and experts around the world with novelty based on the theoretical, experimental, ...