SIGMA TEKNIKA
Vol 5, No 2 (2022): SIGMATEKNIKA, VOL. 5, N0. 2, NOVEMBER 2022

Efisiensi Persediaan Kantong Semen Berbasis Metode MIN-MAX, EOQ, dan TWO-BIN di Packing Plant PT AKA

Muhammad Ryfqie Alamanda Rozaq (Universitas Muhammadiyah Gresik)
Nina Aini Mahbubah (Universitas Muhammadiyah Gresik)



Article Info

Publish Date
29 Nov 2022

Abstract

PT AKA  is a multinational enterprise engaged in the cement industry. One of the supporting raw materials in cement production is cement bags. Demand for cement bags is directly proportional to the demand for cement. The production division has been experiencing the problem of inefficiency in determining the supply of cement bags. This study aims to evaluate the company's policy in controlling the supply of raw materials for cement bags by comparing the 3 Min-Max, EOQ, and Two-Bin methods. Quantitative data were used: demand for cement bags, storage, and ordering costs. Forecasting data calculations were performed using Minitab software. The results showed that the Min-Max method produced the optimal efficiency with a total inventory cost of Rp. 119,107,700 for 40 kg cement bags, and Rp. 35,528,720 for 50 kg cement bag.

Copyrights © 2022






Journal Info

Abbrev

sigmateknika

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Control & Systems Engineering Electrical & Electronics Engineering Industrial & Manufacturing Engineering Mechanical Engineering

Description

SigmaTeknika adalah jurnal Fakultas Teknik yang merupakan media publikasi ilmiah internal di lingkungan Fakultas Teknik Unrika dengan fokus pada karya ilmiah berupa tulisan dari hasil penelitian yang dilakukan oleh dosen atau mahasiswa yang meliputi disiplin ilmu teknik mesin, teknik industri, ...