International Journal of Civil Engineering and Infrastructure (IJCEI)
Vol 2, No 2 (2022): IJCEI Volume 2 No. 2

DESAIN CHANGES IN A SHORT DURATION CONSTRUCTION PROJECT WITH COST AND TIME BOUNDARIES: A PROJECT REVIEW

Rachmad Irwanto (Unknown)



Article Info

Publish Date
04 Jan 2023

Abstract

Design changes are inevitable in most projects. In many construction projects they may look not too complicated to be executed in front of computer models. The actual situation turned out to be the other way around. Apart from detailed changes in shop drawings, bill of quantity and specifications, administrative works related to the project are quite considerations. These mounted consequences would be more for short duration projects with government funding executed in the near end book period. The allocated execution period for short duration projects is not usually allowing rapid changes for the unexpected consequences. This paper presents what actually happens inside the project management during the contract change order process.

Copyrights © 2022






Journal Info

Abbrev

ijcei

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Decision Sciences, Operations Research & Management Engineering Environmental Science Transportation

Description

The objective of the IJCEI is to fully document advances in International research in the fields of construction and infrastructure. IJCEI welcomes submissions in the following areas: structural engineering, geotechnical engineering, transportation engineering, hydraulic engineering, management ...