Jurnal Rekayasa dan Manajemen Sistem Industri
Vol 3, No 3 (2015)

EVALUASI CAPAIAN BIAYA DAN KETEPATAN JADWAL PENGERJAAN BUND WALL DENGAN EARN VALUE METHOD (Studi Kasus: PT Pelangi Indokarya, Surabaya)

Valinda, Tyasha Warna (Unknown)
Sugiono, Sugiono (Unknown)
Sari, Ratih Ardia (Unknown)



Article Info

Publish Date
19 Mar 2015

Abstract

Jika membutuhkan abstrak silahkan menghubungi author melalui email tyashawarnavalinda@yahoo.com, sugiono_ub@ub.ac.id,rath.ardia@ub.ac.id Terima kasih

Copyrights © 2015