SITEKIN: Jurnal Sains, Teknologi dan Industri
Vol 20, No 2 (2023): June 2023

Designing the Layout of Fibreglass Production Facilities Using the ARC (Activity Relationship Chart) and ARD (Activity Relationship Diagram) Methods at PT. XYZ

Puji, Ari Andriyas (Unknown)
Mulyadi, Agus (Unknown)
Novrianto, M. Fajri (Unknown)



Article Info

Publish Date
04 Feb 2023

Abstract

PT. XYZ is a plastic material and product manufacturing company founded in Riau in 1997. This company produces fibreglass (FRP) goods and accepts design requests according to consumer demand. In addition, PT. XYZ also has water tanks made of Polyethylene (HDPE) and stainless steel. In practice, some inefficiencies and inefficiencies make it difficult for operators to find tools such as grinders. This study uses the ARC (Activity Relationship Chart) and ARD (Activity Relationship Diagram) and redesigns the layout of the fibreglass production facility. The results of the study show changes and rotations in the 90º room operator, the transfer of measurements and cuts close to the base material mixture workstation located in the fibreglass production division room, and the addition of 4 workstations because it utilizes an empty floor. Keywords: ARC, ARD, Fiberglass, Layout

Copyrights © 2023






Journal Info

Abbrev

sitekin

Publisher

Subject

Control & Systems Engineering Decision Sciences, Operations Research & Management Economics, Econometrics & Finance Industrial & Manufacturing Engineering Other

Description

Sesuai dengan standard ISO 45001 bahwa karyawan harus berpartisipasi dalam melakukan pencegahan kecelakaan. Untuk itu perusahaan telah menetapkan Program Hazob (Hazard Observation) untuk mengidentifikasi bahaya dan melakukan tindakan koreksinya. Penerapan Program Hazob masih dengan metode ...