NEUTRON : Research from all areas of the Civil Engineering
Vol 22 No 2 (2023): JANUARY 2023

CONCRETE BRIDGE DESIGN PRT 80M SPAN TENSION

Muhammad Alif lutfi (Faculty of Engineering and Computer Science Civil Engineering Study Program Narotama University Surabaya Jl. Arif Rahman Hakim 51 Surabaya)
Tony Hartono Bagio (Civil Engineering Departments, Faculty of Engineering, Narotama University Surabaya, Indonesia)



Article Info

Publish Date
23 Feb 2023

Abstract

Kali warkapi bridge km 49+250 Manokwari, West papua which connects several districts in West papua province stretches 80m based because the bridge previously decreased until it is no longer feasible to use, the type of steel frame bridge structure, then in this final project the design for the replacement of kali warkapi bridge using prestressed concrete structure type at this initial stage the analysis of exsisting conditions, planning of upper and lower bridge structures and calculations is carried out. Superstructure planning takes into account the loads that may occur, namely self-load, additional dead load, traffic load, wind load and earthquake load. In planning the bridge is calculated using Ms.Excel.

Copyrights © 2023






Journal Info

Abbrev

neutron

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Engineering Transportation

Description

s an open-access journal publishing original research from across all areas of the Civil Engineering We offer our authors a highly respected home for their research. Partnering with our extensive network of expert peer reviewers, our editorial team provides rigorous, objective and constructive peer ...