Specta Journal of Technology
Vol. 4 No. 1 (2020): SPECTA Journal of Technology

Analisa Perhitungan Pekerjaan Reparasi Kapal Dengan Metode Critical Path Method (CPM): cpm

Alamsyah bin Muh. Saleh Alam Muhammad (Institut Teknologi Kalimantan)



Article Info

Publish Date
14 Apr 2020

Abstract

Meranti Nusa Bahari carries out two types of businesses, firstly ship repair and secondly ship building services. Technical analysis of ship repair work using a simple table method. The purpose of this research is to find out how long the ship repairs. The method used is CPM (Critical Path Method). The results of this research are technical analysis of work using a simple table that is able to repair one unit of ship within 22 working days and 20 ships in a year. While the analysis with CPM method found 18 working days per unit of ship and 25 units of ships in a year. There has been a decrease in working time per ship unit of 4 working days which can be used to work on other vessels, with an increase in the number of vessels of 4~5 ships in a year where there is an increase in repair productivity by 20%.

Copyrights © 2020






Journal Info

Abbrev

sjt

Publisher

Subject

Chemical Engineering, Chemistry & Bioengineering Civil Engineering, Building, Construction & Architecture Computer Science & IT Electrical & Electronics Engineering Environmental Science

Description

SPECTA journal is published by Lembaga Penelitian dan Pengabdian kepada Masyarakat, Institut Teknologi Kalimantan, Balikpapann Indonesia. SPECTA is an open-access peer reviewed journal that mediates the dissemination of academicians, researchers, and practitioners in the field of Physics, ...