JISO : Journal of Industrial and Systems Optimization
Vol 6, No 1 (2023): Juni 2023

ANALISIS KOMPONEN KRITIS DAN PENJADWALAN PERAWATAN MESIN INJECT MOLDING DENGAN METODE FMEA PADA PT. ANGKADA RAYA

Muhammad Rizal Nur Alamsyah (Universitas 17 Agustus 1945 Surabaya, Surabaya, Indonesia)
Wiwin Widiasih (Universitas 17 Agustus 1945 Surabaya, Surabaya, Indonesia)



Article Info

Publish Date
28 Jun 2023

Abstract

PT. Angkada Raya perusaahaan manufaktur bidang pengolahan limbah selang PVC, Vinyl, yang beralamatkan dijalan Rangkah II No. 19 Kecamatan Tambaksari Kota Surabaya, perusahaan ini menggunakan 7 mesin inject model lama,  hanya 3 dari 7 yang digunakan untuk mengurangi downtime atau kerusakan secara tiba-tiba  diperlukannya pengecekan berkala, jika mesin  mati tidak bisa digunakan maka akan berdampak pada proses produksi, penelitian dilakukan untuk mengetahui komponen kritis apa saja yang perlu diutamakan menggunakan metode Failure Mode Effect Analysis yaitu (RPN) dengan total nilai sebesar 606, serta usulan waktu interval pengecekan atau pemeliharaan secara berkala yaitu Band heater 71 hari, Mold 113 hari, Screw 111 hari, Cooling 57 hari, CPU 152 hari, Oli 122 Hari dan untuk mengetahui penyebab seringnya terjadi kegagalan digunakan metode Fault Tree Analysis (FTA) ada 2 faktor umum yaitu eksternal dan internal seperti Band Heater Internal masalah dikabel dan eksternal dari bahan baku dan pemasangan kabel kurang tepat, Mold Internal masalah ditemperatur tinggi atau cooling dan eksternal pengecekan tidak teratur, Screw internal masalah pada leher hopper overheat dan eksternal operator tidak melakukan pengecekan secara berkala serta material tercampur minyak, habis, membeku, Cooling internal ada pembekuan dan eksternal kurang pengecekan berkala, CPU internal masalah terlalu panas serta eksternal kurang pemeliharaan berkala.ABSTRACTPT. Angkada Raya, a manufacturing company in the field of PVC, Vinyl hose waste treatment, which is located at Jalan Rangkah II No. 19 Tambaksari District, Surabaya City, this company uses 7 injection machines, only 3 out of 7 are used to reduce downtime or sudden damage. find out what critical components need to be prioritized using the Failure Mode Effect Analysis method, namely (RPN) with a total value of 606, as well as the proposed time interval for periodic checking or maintenance, namely Band heater 71 days, Mold 113 days, Screw 111 days, Cooling 57 days, CPU 152 days, Oil 122 days and to find out the causes of frequent failures, the Fault Tree Analysis (FTA) method is used. There are 2 general factors, namely external and internal, such as Band Heater Internal wiring and external problems from raw materials and improper wiring, Internal Mold problem with high temperature or cooling and external checking is not regular, internal screw is a problem with the neck of the hopper overheat and the external operator does not check regularly and the material is mixed with oil, runs out, freezes, internal cooling has freezing and external lacks periodic checking, internal CPU overheating problem as well as external lack of periodic maintenance.

Copyrights © 2023






Journal Info

Abbrev

jiso

Publisher

Subject

Environmental Science Industrial & Manufacturing Engineering Transportation

Description

JISO merupakan jurnal ilmiah yang menjadi wadah bagi para peneliti, akademisi dan praktisi untuk mempublikasikan hasil penelitiannya di bidang rekayasa sistem dan industri diterbitkan oleh LPPM Universitas Maarif Hasyim Latif (eISSN 2622-898X) (pISSN 2622-8971). Dengan fokus dan materi tentang ...