TEKNOSIA
Vol. 16 No. 2 (2022): Desember 2022

ANALISIS PENJADWALAN PROYEK PADA PEKERJAAN REPETITIF DENGAN METODE LINE OF BALANCE (LOB) DAN PRECEDENCE DIAGRAM METHOD (PDM)

Fepy Supriani (Universitas Bengkulu)



Article Info

Publish Date
09 Jan 2023

Abstract

In housing projects, many work items are repetitive work. A project schedule that does not take into account repetitive work can lead to delays in project completion time. Proper scheduling methods will need to be applied so that project resources can be used effectively and efficiently. The research aims to analyze project scheduling and know the effectiveness of repetitive job scheduling projects in the building housing project. The study is perfomed by using Line Of Balance (LOB) which is a method of using the operating balance for each on-going performance work. Precedence Diagrams Method (PDM) shows critical tasks that can not be shown by LOB. The subject of this research is the construction of 10 houses sized 35/135 m2 in which 15 workers were employed. The results show that the duration needed to complete the project is  69 days. Compared to the existing duration (78 days) there is a 9 days difference. The effectiveness of scheduling is  11,5%. Keyword: Line of Balance, Precedence Diagram Method, Repetitive Project, Scheduling.

Copyrights © 2022






Journal Info

Abbrev

teknosia

Publisher

Subject

Automotive Engineering Civil Engineering, Building, Construction & Architecture Computer Science & IT Control & Systems Engineering Engineering Transportation

Description

A journal TEKNOSIA, Provides a forum for publishing the original research articles, review articles from contributors, and the novel technology news related to pure and interdisciplinary of sciences and engineering. Scientific articles dealing with sciences, technology and engineering fields of ...