Jurnal Rekayasa Proses dan Industri Terapan
Vol. 2 No. 4 (2024): November: Jurnal Rekayasa Proses dan Industri Terapan ( REPIT )

Perancangan Perawatan Mesin Cetak Offset Dengan Pendekatan RCM, (Reliability Centered Maintenance): (Studi Kasus Pada Cv Madyotomo Jawa Tengah)

Apif Sofyan (Unknown)
Indah Wahyu Utami (Unknown)
Ringgo Ismoyo Buwono (Unknown)



Article Info

Publish Date
30 Nov 2024

Abstract

Machines play a crucial role in a production process, highlighting the need for maintenance to ensure their proper functioning. The methods employed include Fault Tree Analysis (FTA), Failure Mode and Effect Analysis (FMEA), and distribution determination. The repair times for each CMYK component are as follows: the bearing component requires 93.541 hours or 4 days, Griver needs 163.235 hours or 7 days, the seal requires 195.349 hours or 9 days, the linner pen needs 248.803 hours or 10 days, and the ink tank needs 260.123 hours or 11 days.

Copyrights © 2024






Journal Info

Abbrev

REPIT

Publisher

Subject

Chemical Engineering, Chemistry & Bioengineering Computer Science & IT

Description

1. Bidang Ilmu Teknologi Industri Pertanian 2. Bidang Ilmu Teknik Kimia 3. Bidang Ilmu Teknik Mesin 4. Bidang Ilmu Teknik Elektro 5. Bidang Ilmu Teknik ...