Jurnal Teknik Industri Terintegrasi (JUTIN)
Vol. 6 No. 4 (2023): Oktober

Pengelompokan Persediaan Spare parts Menggunakan Analisis FSN di PT. XYZ

Amalia, Wahyuni (Unknown)
Pangestu, Adryan (Unknown)
Oktavia, Nurike (Unknown)



Article Info

Publish Date
27 Oct 2023

Abstract

Spare part inventory is very important for the continuity of forklift repair and maintenance activities at PT. XYZ. Currently it is not known which spare part inventory groups are in higher demand (fast moving) compared to other spare parts. This can have an impact on determining inaccurate inventory amounts. This research aims to determine which spare part groups are fast moving, slow moving and non-moving based on turnover ratio. From the results of calculations for 45 types of spare parts, there are 23 types of goods that are fast moving, 14 types of goods are slow moving and 6 types of goods are non-moving, while the other 2 do not have an inventory turnover ratio. Based on these groupings, the Company can determine the optimal order quantity to avoid stock shortages for fast moving goods.

Copyrights © 2023






Journal Info

Abbrev

jutin

Publisher

Subject

Decision Sciences, Operations Research & Management Energy Engineering Industrial & Manufacturing Engineering Mechanical Engineering

Description

Jurnal Teknik Industri Terintegrasi merupakan jurnal yang dikelola oleh Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Pahlawan Tuanku Tambusai yang menjebatani para peneliti untuk mempublikasikan hasil penelitian di bidang ilmu teknik dan teknik industri mencakup proses ...