Extrapolasi
Vol 20 No 01 (2023)

Analisis Pengaruh Penyebab Change order pada Pembangunan Apartemen di Kota Surabaya




Article Info

Publish Date
22 Jun 2023

Abstract

The main objective of construction projects is to achieve the desired outcome, which means that the final results should align with the project plan and contract agreement. However, construction projects often encounter problems such as changes in orders. These changes can be caused by a variety of factors, including the decision of the owner, environmental, consultants, and other variables. The purpose of this study was to identify the causes of order changes, the most significant cause of order changes, and the extent to which order changes impact the development of apartments in Surabaya. The research methodology used in this study was descriptive statistic analysis, and the data was collected through questionnaires administered to the contractor management teams working on the Bess Mansion construction projects. The results revealed that there were 24 and 22 variables, respectively, that were identified as causes of order changes. The project owner was found to have the most significant impact on quality, accounting for 52.90% of the changes. The impact of order changes for the Bess Mansion Apartment construction project.

Copyrights © 2023






Journal Info

Abbrev

exp

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Focus and Scope Extrapolasi is published by Department of Civil Engineering Faculty of Technology, Universitas 17 Agustus 1945 Surabaya. The Extrapolasi editorial is very open in accepting articles related to : Building Materials and Structures Constructions Technology Constructions Management, Road ...