Shop building collapse in housing Cendrawasih   Permai, Sungai Pinang, Jalan A Yani, Samarinda Kal-team to the attention of all parties. The loss and the impact it had very detrimental to all parties, especially the workers and the project is and how much more casualties. The failure which  led   to the collapse of the construction of this building  is  concerned     suwatu  and    tarnished the city samarinda. Seventeen three-storey tenement buildings that collapsed suddenly, leavingdebris crushed material.             As a result  of this incident the need for building design should consider several criteria, including criteria  for the power construction, efficient time and cost, power, wind load, seismic  calculations, and also other aspects. Multistory building plan in terms of structure requires careful  consideration,   particularly building up structural work very useable and implemented standards in the world, especially in the field of civil engineering building.             In the implementation of this final project with  Design    Review to be conducted projected Sick Building Office in the city of Samarinda. Up    Design Review for comparison of the structure calculations so that the    calculations are reviewed planner and will look different because planners 3 floors and converted into 5 floors. Adaiah calculation method of building structures with  SAP  2000 program, Manual calculation using the standard Takabeya. Calculation  SNI 03-2847-2002 until this calculation
Copyrights © 2014