Jurnal Aplikasi Teknik Sipil
Vol 22, No 2 (2024)

Pengendalian Penyelesaian Proyek Berbasis Kinerja Menggunakan Hybrid Earned Value - Crash Program

Soetjipto, Jojok Widodo (Jurusan Teknik Sipil Fakultas Teknik Universitas Jember)
Adinanda, Della Ayu (Jurusan Teknik Sipil Fakultas Teknik Universitas Jember)
Arifin, Syamsul (Jurusan Teknik Sipil Fakultas Teknik Universitas Jember)



Article Info

Publish Date
31 May 2024

Abstract

Project performance is an essential reference in supporting the success of construction implementation so that costs and completion time are according to plan. Previous research states that projects that experience delays will impact cost overruns which can be detrimental to contractors and project owners. This study takes the case of a performance evaluation on a building construction project that experienced a delay of 15.496% (25th week). The performance measurement results using the earned value, the project has an SPI value = 0.493, meaning that the project experienced significant delays. If the project is not controlled, it will take 72 weeks to complete from the 48-week plan at the cost of Rp. 64.57 billion from Rp. 57.23 billion. Control of this project needs acceleration which was carried out using the Crash Program method in 2 ways: (i) increasing the number of workers and (ii) maintaining the number of existing workers but increasing overtime hours. A practical solution alternative is to increase the number of workers, which results in a project completion time of 43 weeks with a final project cost of IDR 58.89 billion

Copyrights © 2024






Journal Info

Abbrev

jats

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Jurnal Aplikasi Teknik Sipil (JATS) E-ISSN 2579-891X, memuat tulisan tentang aplikasi dibidang Teknik Sipil. Aplikasi ini boleh berasal dari semua cabang ilmu teknik sipil baik itu struktural, geoteknik, manajemen konstruksi, hidrologi, transportasi, dan informatika teknik sipil. Sehingga aplikasi ...