Jurnal Teknik Industri Terintegrasi (JUTIN)
Vol. 7 No. 2 (2024): April

Penentuan Jumlah Persediaan Sparepart Berdasarkan Waktu Maintennance Headtruck Giga di PT. Bima Site Berlian

Setiawan, Febri Hari (Unknown)
Wati, Putu Eka Dewi Karunia (Unknown)



Article Info

Publish Date
22 Apr 2024

Abstract

PT. Berkah Industri Mesin Angkat (PT.BIMA) is a company engaged in the maintenance and supply of port equipment. In the service process there are five types of transport aircraft at PT BIMA. Loading and unloading equipment operates continuously, causing a decrease in the level of equipment reliability and causing frequent breakdowns and high downtime on the machines, especially the Headtruck equipment. To minimize breakdowns and downtime, it is necessary to have a good maintenance scheduling system to prevent machine damage. Mean Time to Failure (MTTF) is one of the company's provisions as a reference for determining an effective maintenance schedule. Therefore, appropriate corrective action is needed to ensure the number of spare parts available so that equipment downtime is not too long which results in decreased/unstable levels of availability and reliability.

Copyrights © 2024






Journal Info

Abbrev

jutin

Publisher

Subject

Decision Sciences, Operations Research & Management Energy Engineering Industrial & Manufacturing Engineering Mechanical Engineering

Description

Jurnal Teknik Industri Terintegrasi merupakan jurnal yang dikelola oleh Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Pahlawan Tuanku Tambusai yang menjebatani para peneliti untuk mempublikasikan hasil penelitian di bidang ilmu teknik dan teknik industri mencakup proses ...