Perhitungan Waste Material Pekerjaan Penulangan, Pengecoran Serta Pemasangan Bekisting Pada Proyek Pembangunan Menara 17 PWNU Jawa Timur

Mohammad Arif Rahman (Unknown)
Ibni Aqiel (Unknown)
Dika Ayu Safitri (Unknown)



Article Info

Publish Date
26 Apr 2024

Abstract

In the current era of globalization, students are not only required to learn theory, but are also required to study in the field. Therefore, students receive a Practical Work course with a weight of 2 credits which is carried out for a minimum of 2 months or the equivalent of 320 hours. This practical work aims to fulfill the requirements for passing the course and learn what you don't get in college. The Practical Work Project that we are carrying out is the East Java Nahdatul Ulama (PWNU) Regional Management Tower 17 Tower Construction project.

Copyrights © 2024






Journal Info

Abbrev

Konstruksi

Publisher

Subject

Chemical Engineering, Chemistry & Bioengineering Computer Science & IT Electrical & Electronics Engineering Engineering

Description

research journal of the Engineering Science Clump. The fields of study in this journal include the sub-groups of Civil Engineering and Spatial Planning, Industrial Engineering, Electrical and Computer Engineering, Earth and Marine ...