Journal of Industrial Engineering Management
Vol 9, No 1 (2024): Journal of Industrial Engineering and Management Vol 9 No 1

SCHEDULING MAINTENANCE PROPOSAL FOR TURBINE MACHINES USING THE AGE REPLACEMENT METHOD AT BALAMBANO HYDROELECTRIC POWER PLANT PT. Vale Indonesia Tbk.

Malik, Rahmaniah (Unknown)
Rauf, Nurhayati (Unknown)
Alisyahbana, Takdir (Unknown)
Ahmad, Arfandi (Unknown)
Fole, Asrul (Unknown)



Article Info

Publish Date
30 Apr 2024

Abstract

PT. Vale Indonesia Tbk. is a company engaged in the mining industry, particularly in nickel processing (Ni). The company operates a power plant at Balambano Hydroelectric Power Plant (2x68.5 MW). The company's usual maintenance practice is limited to corrective maintenance, which involves replacing or repairing components only when they are damaged. The aim of this research is to determine the optimal replacement time for preventive maintenance on turbine machines in order to minimize downtime. The age replacement method is used to calculate the replacement interval for components based on their usage life. The research findings show that the mean time to failure (MTTF) of the wicket gate is 2217.824 hours or 92.41 days, which means that the component may experience failure again after operating for that MTTF duration. Therefore, the recommendation is to replace the component every 85 days of operation and perform inspections every 15 days.

Copyrights © 2024






Journal Info

Abbrev

JIEM

Publisher

Subject

Control & Systems Engineering Decision Sciences, Operations Research & Management Energy Engineering Industrial & Manufacturing Engineering

Description

Journal of Industrial Engineering and Management memiliki No.ISSN : 2541-3090 (Cetak) dan No.ISSN : 2541-3090 (Online). Journal of Industrial Engineering and Management diterbitkan oleh Prodi Jurusan Teknik Industri Fakultas Teknologi Industri Universitas Muslim Indonesia. Terbit 2 (Dua) kali dalam ...