MANAJEMEN RISIKO ESTIMASI BIAYA PADA TAHAP PERENCANAAN PROYEK KONSTRUKSI

Yuliana, Ni Putu Indah (Unknown)
Ebtha Yuni, Ni Kadek Sri (Unknown)



Article Info

Publish Date
29 Apr 2024

Abstract

Cost estimation as a reference for analyzing the budget for the implementation of construction projects is very vulnerable to risks, so analysis is needed to reduce losses that can occur. The aim of study is to discover dominant risks, evaluate risks, define risk mitigation strategies and risks ownership to the cost estimation process at the planning stage. The research uses mix methods beetween qualitative and quantitative and data collection through surveys and interviews. The research respondents used the purposive sampling method. The results of the study showed that the identified risks amounted to 35 (thirty-five) risks and came from 9 (nine) risk sources. Risks that are included in the dominant category are unacceptable risks (unacceptable) as many as 10 risks and undesirable (undesirable) risks as many as 25 risks. The mitigation carried out is to appoint an experienced estimator, improve coordination between teams, ensure the availability and accuracy of data and learn more details of tender documents. The allocation of risk ownership on the contractor side is 33 risks (94.29%), followed by the owner and planning consultant each have 1 risk allocation (2.86%).

Copyrights © 2024






Journal Info

Abbrev

JPR

Publisher

Subject

Education

Description

Jurnal Ilmiah Poli Rekayasa adalah jurnal ilmiah yang diterbitkan 2 edisi dalam setahun, bulan April dan Oktober. Terbit sejak tahun 2005. Fokus Kajian jurnal ini adalah Fokus kajian artikel dalam JPR mencakup Mechanical Engineering, Civil Engineering, dan Electronica, Electricty dan ...