Mechanical failures can cause Electric Submersible Pump (ESP) disruptions, shortening their lifespan. Despite improvements in run-time, unexpected failures still result in significant production deferment and loss, especially for oil & gas production equipment in Tuban East Java (TEJ) field. Therefore, we used Reliability Centered Maintenance (RCM) to analyze FMEA, employing two methods: Montgomery and Runger's (MGR) and Bernard's approaches. The MGR approach provided a better prediction of the failure rate. The ESP flat cable has the highest RPN, requiring maintenance of US$59,342 for an ideal 509-day period.
Copyrights © 2024