CV. Asta Karya Abadi is a manufacturing industry that operates as a supplier of quality stainless steel products. Poor layout design in factories causes cross movement between departments and results in excessive total material movement, for this reason this research aims to redesign work stations. To solve the facility layout problem at CV Asta Karya Abadi, the SLP and CRAFT methods, as well as Promodel Software, were used. Based on the actual layout, the total displacement moment is 285,948 m/ 3 months, the displacement moment value in the proposed layout using the SLP method has a value of 194,298 m/ 3 months and the CRAFT method has a value of 280,729 m/ 3 months. Redesign the layout of production facilities at CV. Asta Karya Abadi, which was built, succeeded in arranging work station provisions so that an efficient process flow was formed. It can be proven from the results of the pro model simulation that the process flow is U-shaped and there is no cross movement between departments.
Copyrights © 2024