ANALYSIS OF PROJECT DELAY USING THE CRITICAL PATH METHOD (CPM): A CASE STUDY ON THE CONSTRUCTION PROJECT OF THE OPD OFFICE BUILDING IN PASURUAN

Purnomo, Didik (Unknown)
Oetomo, Wateno (Unknown)
Marleno, Risma (Unknown)



Article Info

Publish Date
24 Jan 2024

Abstract

In construction project control, the main factors of concern are quality, time and cost control. So it is necessary to use one method in the implementation of control. This study aims to analyze the time and cost of the Raci OPD Office Building Construction project. The benefit of this research is to anticipate potential delays that occur in the project. The problem limitation is focused on work that has not been completed in the remaining time of the contract period. To analyze time and cost, this research uses Critical Path Method (CPM) and Time-Cost Trade-Off (TCTO) which begins with determining the work network and critical path. TCTO analysis is carried out by shortening the duration of work by adding 3 hours of overtime and calculating the Crash Slope of each job on the critical path. Rescheduling is done by accelerating the work that has the lowest cost. The results showed that the most effective rescheduling was carried out on the Lt.3 Installation and Plastering work with the acquisition of an acceleration duration of 8 days. And the total cost required for this acceleration is Rp. 29,441,424, - or Rp. 1,226,726, - per day for 24 days.

Copyrights © 2024






Journal Info

Abbrev

JHSSB

Publisher

Subject

Law, Crime, Criminology & Criminal Justice Social Sciences

Description

JOURNAL OF HUMANITIES, SOCIAL SCIENCES AND BUSINESS (JHSSB) has main objective which is to cater an intellectual platform for the international scholars. JHSSB aims to promote interdisciplinary studies in business and social science and become the leading journal in humanities, social science and ...