Info-Teknik
Vol 25, No 1 (2024): INFOTEKNIK VOL. 25 NO. 1 JULI 2024

EVALUASI TINGKAT KERUSAKAN JALAN SEBAGAI DASAR PENENTUAN PERBAIKAN JALAN DI KOTA KASONGAN (STUDI KASUS : JALAN KATUNEN – TUMBANG LITING)

DASLI, DASLI (Unknown)
Silitonga, Sutan Parasian (Unknown)
Desriantomy, Desriantomy (Unknown)



Article Info

Publish Date
09 Jul 2024

Abstract

The research results show thatthe type of damage that occurred, from the largest to the smallest, namely: Alligator Cracking with an area of 1642.10 m2 (91.76%), Potholes with an area of 109.15 m2 (6.10%), Depression with an area of 30.10 m2 (1.68%), Rovelling with an area of 4.40 m2 (0.25%), Bleeding with an area of 3.87 m2 (0.22%) ). The level of damage to the Muara Katunen – Tumbang Liting road section is based on the Bina Marga and PCI (Pvaement Condition Index) methods, namely: The Bina Marga method has a road condition value of 1.50 and a priority value of 11.50 (priority value 7 and so on or class C) and MethodsPavement Condition Index (PCI) has a PCI value of 75.06 with a very good rating (very good). The type of maintenance that can be applied to the Muara Katunen – Tumbang Liting road is routine maintenance in the form of demolition and patching using class B lats. The cost required to repair the damage that occurred on the Muara Katunen road – collapsed liting is Rp. 262.239.962

Copyrights © 2024






Journal Info

Abbrev

infoteknik

Publisher

Subject

Engineering

Description

Jurnal Info – Teknik menerbitkan artikel – artikel karya orisinil dan signifikan pada Bidang Rekayasa ...