Uranus: Jurnal Ilmiah Teknik Elektro, Sains dan Informatika
Vol. 2 No. 3 (2024): September: Jurnal Ilmiah Teknik Elektro, Sains dan Informatika

Evaluasi Instalasi Kelistrikan Sesuai Standar Puil di CV Multi Teknik Perkasa Palembang

Riko Saputra (Universitas PGRI Palembang)
M. Saleh Al Amin (Universitas PGRI Palembang)
Yudi Irwansi (Universitas PGRI Palembang)



Article Info

Publish Date
30 Jul 2024

Abstract

Research conducted at CV Multi Teknik Perkasa Palembang indicates that the total installed power for various panels is 18,448 watts, consisting of 448 watts for lighting panels, 5100 watts for induction motor power panels, 9000 watts for cooling panels, and 3900 watts for lamp and socket panels. Further analysis reveals that the power consumption does not exceed the available power. Therefore, the electrical installation at CV Multi Teknik Perkasa Palembang is in good and safe condition for use.

Copyrights © 2024






Journal Info

Abbrev

Uranus

Publisher

Subject

Computer Science & IT

Description

naskah hasil-hasil penelitian di bidang Teknik Elektro, Sains dan Informatika. Uranus : Jurnal Ilmiah Teknik Elektro, Sains dan ...