Jurnal Civil Engineering Study
Vol. 4 No. 01 (2024): Jurnal Civil Engineering Study

PENGENDALIAN WAKTU DAN PENJADWALAN ULANG MENGGUNAKAN METODE CPM (CRITICAL PATH METHOD)

Purwantoro, Almuntofa (Unknown)
To’unni, Attie Wawey Lagi (Unknown)
Uda, Subrata Aditama K.A. (Unknown)



Article Info

Publish Date
01 Apr 2024

Abstract

In some development projects, finishing the work inside a restricted time is normal. This can never again be kept away from after the utilization of labor with is presently not equally. CPM (Critical Path Method) is a critical path the that intends to decide project arranging and time estimates that are deterministic/positive. Poin of investigation utilizing this method is to decide the time and cost of the undertaking and figure out what activities are remembered for the fundamental activities. Project arranging helps show the relationship of every development to various activities and normal assignments, recognizes which connections ought to come first among activities, and shows pragmatic time measures for each activity. Time control made no difference and the rescheduling results acquired for Development project the CPM (Critical Path Method) strategy were gotten in 300 days as per the underlying term of work.

Copyrights © 2024






Journal Info

Abbrev

CES

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Jurnal Civil Engineering Study (JCES) contains writings about applications in the field of Civil Engineering. This application may come from all branches of civil engineering, be it structural, geotechnical, construction management, hydrology, transportation, and civil engineering informatics. So ...