Slope Design for Cost Optimization of Slope Cutting and Reinforcement (Case Study: Trans-Sumatra Toll Road Rengat Pekanbaru Section Lingkar Pekanbaru Junction Pekanbaru Sta. 205+150 - 205+725)

Prasetiyo, R Fiansyah Dwi (Slope Design for Cost Optimization of Slope Cutting and Reinforcement (Case Study: Trans-Sumatra Toll Road Rengat Pekanbaru Section Lingkar Pekanbaru Junction Pekanbaru Sta. 205+150 - 205+725))
Mochtar, Noor Endah (Civil Engineering Department, Sepuluh Nopember Institute of Technology)
Mochtar, Indra Surya B (Civil Engineering Department, Sepuluh Nopember Institute of Technology)
Muliawan, Mahar (Project Director of Lingkar Pekanbaru Junction Toll Road Project, PT. Hutama Karya (Persero))



Article Info

Publish Date
24 Jan 2025

Abstract

The trans-Sumatra toll road project currently under construction is the Rengat - Pekanbaru toll road construction project, the Pekanbaru ring road section located at km 205 + 150 to km 205 + 725 (575m long). In this section, quite deep excavation work is required as well as quite wide land acquisition which causes expensive land acquisition costs. In this study, slope variations were carried out with steeper angles in order to obtain a smaller road ROW; only additional reinforcement needs to be planned so that the slope is more stable and does not cause landslides. The stability of the varying slope slopes was analyzed using an auxiliary program to obtain the safety factor for each selected slope. In conducting the analysis, the elevation of the groundwater level was varied, namely at the bottom of the excavation (conditions during the dry season), as in secondary data, and at the top of the excavation (conditions during maximum rainfall). Slope stability analysis was also carried out using the ' theory of cracked soil' approach. Slope reinforcement using ground anchors will be planned if SF <1.0; for slopes that have SF ≥ 1.0, rainwater management will be carried out without reinforcement. The excavation slope at Sta 205+400 with a slope of 1:2 and 1:3 and the groundwater level at the top of the excavation is SF = 1.73; if the analysis is carried out using the cracked soil approach, the safety factor value drops to SF = 0.68. In addition, in the alternative slope gradients, namely alternative 1 with a slope angle of 1:1 and alternative 2 with a slope angle of 2:1, the slope safety factor changes quite drastically to 0.39 in alternative 1 and 0.2 in alternative 2. The cost calculation for alternative 2 with a slope gradient of 2:1 saves excavation work of 183,136.31 m3, 34,375 m2 of land acquisition and reinforcement costs of 3,422 Ground anchor points in cracked soil conditions and groundwater elevation with existing conditions of secondary data. Cost optimization of Rp. 18,423,905,547,-

Copyrights © 2025






Journal Info

Abbrev

jifam

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Computer Science & IT Control & Systems Engineering Decision Sciences, Operations Research & Management Economics, Econometrics & Finance Energy Engineering Environmental Science Library & Information Science Mathematics Transportation

Description

Journal of Infrastructre & Facility Asset Management is aimed to develop Infrastructure & Facility Asset Management Sciences and Knowledge. This journal accepts paper contains the results of research or knowledge development in Infrastructure & Facility Asset Management from anywhere. This journal ...