Analisis bottleneck pada proses ganti meter baru di gudang PDAM Surya Sembada Surabaya dengan metode Root Cause Analysis

Aditya, Bintang Anggry Awan Putra (Unknown)
Winursito, Yekti Condro (Unknown)



Article Info

Publish Date
13 Jan 2025

Abstract

This research aims to provide an in-depth understanding of the causes of bottlenecks in the water meter replacement process at PDAM Surya Sembada Surabaya and offer better solutions to overcome them. This field research was conducted at PDAM Surya Sembada Surabaya using data collection methods such as observation and direct interviews with managers or relevant task force members. The collected data was then analysis using Root Cause Analysis (RCA) technique.  The findings of this study show that there are two main obstacles in the work: the water meter procurement process that uses a tender system that requires a long delivery time, and the lack of flexibility in project scheduling related to weather conditions, coupled with tight targets and pressure to complete tasks. Therefore, improvements are needed in the water meter procurement process and policies regarding target adjustments in times of adverse weather conditions.

Copyrights © 2025






Journal Info

Abbrev

jutin

Publisher

Subject

Decision Sciences, Operations Research & Management Energy Engineering Industrial & Manufacturing Engineering Mechanical Engineering

Description

Jurnal Teknik Industri Terintegrasi merupakan jurnal yang dikelola oleh Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Pahlawan Tuanku Tambusai yang menjebatani para peneliti untuk mempublikasikan hasil penelitian di bidang ilmu teknik dan teknik industri mencakup proses ...