Analisis Anggaran Biaya Dan Waktu Optimal Dengan Least Cost Scheduling

Harasid , Harun (Unknown)



Article Info

Publish Date
25 Nov 2024

Abstract

Penelitian ini menganalisis anggaran biaya dan waktu optimal pada proyek Rehabilitasi Kantor Camat Lawe Alas menggunakan metode Least Cost Scheduling dan analisis Crashing. Proyek ini memiliki waktu penyelesaian normal 182 hari dengan biaya normal sebesar Rp. 160.151.592,33. Analisis dilakukan dengan mempertimbangkan penambahan jam kerja untuk mempercepat waktu penyelesaian proyek. Hasil penelitian menunjukkan bahwa penambahan 1 jam kerja dapat mempercepat penyelesaian 12 hari dengan biaya tambahan 1,6% dari biaya normal. Penambahan 2 jam kerja mempercepat 23 hari dengan biaya tambahan 20,89%, penambahan 3 jam kerja mempercepat 33 hari dengan biaya tambahan 40,18%, dan penambahan 4 jam kerja mempercepat 42 hari dengan biaya tambahan 59,48%. Berdasarkan analisis, disimpulkan bahwa penambahan jam kerja efektif untuk mempercepat waktu penyelesaian proyek, namun harus diterapkan secara selektif pada pekerjaan kritis agar tidak menimbulkan peningkatan biaya yang tidak proporsional. Penerapan penambahan jam kerja pada pekerjaan non-kritis hanya akan menambah biaya tanpa memberikan manfaat percepatan yang signifikan. Oleh karena itu, strategi Least Cost Scheduling dan analisis Crashing direkomendasikan untuk mengoptimalkan biaya dan waktu proyek secara efisien. This research analyzes the optimal cost and time budget for the Lawe Alas District Head Office Rehabilitation project using the Least Cost Scheduling method and Crashing analysis. This project has a normal completion time of 182 days with a normal cost of Rp. 160,151,592.33. The analysis was carried out by considering additional working hours to speed up the project completion time. The research results show that an additional 1 hour of work can speed up completion by 12 days at an additional cost of 1.6% of the normal cost. Adding 2 working hours speeds up 23 days with an additional cost of 20.89%, adding 3 working hours speeds up 33 days with an additional cost of 40.18%, and adding 4 working hours speeds up 42 days with an additional cost of 59.48%. Based on the analysis, it was concluded that increasing working hours is effective in speeding up project completion times, but must be applied selectively to critical work so as not to cause a disproportionate increase in costs. Applying additional working hours to non-critical work will only increase costs without providing significant acceleration benefits. Therefore, Least Cost Scheduling strategy and Crashing analysis are recommended to optimize project costs and time efficiently.

Copyrights © 2024






Journal Info

Abbrev

jti

Publisher

Subject

Automotive Engineering Chemical Engineering, Chemistry & Bioengineering Civil Engineering, Building, Construction & Architecture Computer Science & IT Electrical & Electronics Engineering

Description

Impression accepts articles in the fields of Electrical Engineering, Mechanical Engineering, Civil Engineering, Marine Technology Industrial Engineering, Marine Fisheries Technology, Agricultural Technology, Informatics Engineering, Information Systems, Computer, Expert systems, Decision Support ...