Journal of Civil Engineering, Planning, and Design (JCEPD)
Vol 2, No 1 (2023): May

Current Mapping on the UBS Surabaya Office Building Construction Project

Nuciferani, Felicia Tria (Unknown)
Yudhatama, Putra Tri (Unknown)
Septiarsilia, Yanisfa (Unknown)
Putra, Kurnia Hadi (Unknown)



Article Info

Publish Date
18 Jul 2023

Abstract

In the world of construction, waste is one of the factors that must be minimized or eliminated, because it can cause cost losses and time delays in the implementation of a construction project. Lean production concept approach using Value Stream Mapping (VSM) tools is a method that can be used to minimize waste that can be seen through value-added activities, non-value added but necessary. The scope of work that has a significant impact on the UBS Surabaya office building construction project consists of ironwork, concrete work, and formwork work on the superstructure, during the period from March to May 2021. In the scope of work identified Value Added amounting to 73 activities (61.34%), and Non-Value Added but Necessary totaling 26 activities (21.85%). There are several types of waste that occur during the implementation process,

Copyrights © 2023






Journal Info

Abbrev

jcepd

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Civil Engineering: Construction Engineering, Construction Management, Transportation, Geotechnics, Hydraulic engineering, Disaster Management Environmental Engineering: water treatment, wastewater treatment, air pollutant control, air quality management, solid waste management, hazardous waste ...