PROCEEDINGS CONFERENCE ON DESIGN AND MANUFACTURE AND ITS APPLICATION
Vol 4 No 1 (2020): Conference on Design and Manufacture and Its Aplication

OPTIMASI MAKESPAN PADA PENJADWALAN PRODUKSI KOMPONEN PANEL FUEL DENGAN METODE SHIFTING BOTTLENECK HEURISTIC DI PERUSAHAAN PENERBANGAN

Azhari Ridhwan (Unknown)
Dra. Endang Pudji Purwanti, M.T. (Unknown)
Renanda Nia Rachmadita, S.T., M.T. (Unknown)



Article Info

Publish Date
07 Jul 2023

Abstract

The fuel component panel has three parts relating to its delivery. Upon request, the three components must be shipped together. Based on the airline's production process, including the work shop flow. In the production process, Airline Companies often experience shipping errors caused by production errors. For production scheduling, Airline Companies use the First Come First Served (FCFS) system. This research was conducted to obtain the optimal makespan value. The results of research conducted using the Shifting Bottleneck Heuristic method obtained makespan value of 22716.12 minutes = 378.60 hours. Scheduling using the Shifting Bottleneck Heuristic is able to minimize the production time of 336.96 minutes = 5,616 hours. Scheduling with the longest sequence occurs on machine (m70) with job sequence j37 - j12 - j13 - j25 - j26 - j2 - j5 - j9 - j22 - j16 - j10 - j11 - j23 - j24 - j7 - j20 - j17 - j18 - j19 - j30 - j31 - j32 - j1 - j4 - j14 - j15 - j27- j28 - j29 - j6 - j3 - j21 - j34 - j8 - j36 - j38 - j40 - j35 - j39.

Copyrights © 2020






Journal Info

Abbrev

CDMA

Publisher

Subject

Control & Systems Engineering Engineering Industrial & Manufacturing Engineering Materials Science & Nanotechnology Mechanical Engineering

Description

The aim of the Conference on Design Manufacture Engineering and Its Application (CDMA) is to provide a scientific platform for researchers, academics, and professionals to share and disseminate original research, innovative ideas, and practical developments in the fields of design engineering, ...