Jurnal Teknik Industri Terintegrasi (JUTIN)
Vol. 8 No. 2 (2025): April

Penerapan Metode Full Time Equivalent (FTE) dalam Analisis Workload untuk Efisiensi Sumber Daya Manusia di Departemen Procurement PT. ABC

Syahfitri, Rini Widya (Unknown)
Mauliddina, Yasmin (Unknown)
Ranti, Gadih (Unknown)



Article Info

Publish Date
10 Apr 2025

Abstract

PT. ABC faces a challenge of excessive workload in the Procurement Department, as indicated by a Full Time Equivalent (FTE) value of 2.4. This imbalance poses a risk of decreased productivity and work quality. This study aims to analyze employee workload using the FTE method, identify the factors contributing to workload disparity, and evaluate the effectiveness of this method in determining the optimal number of employees. The FTE method was applied by collecting data on available working time, effective working hours, allowances, and workload standards. The analysis revealed that the imbalance is driven by increased task volume, limited human resources, and job complexity. It is recommended to add one employee to each key position to distribute the workload more evenly

Copyrights © 2025






Journal Info

Abbrev

jutin

Publisher

Subject

Decision Sciences, Operations Research & Management Energy Engineering Industrial & Manufacturing Engineering Mechanical Engineering

Description

Jurnal Teknik Industri Terintegrasi merupakan jurnal yang dikelola oleh Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Pahlawan Tuanku Tambusai yang menjebatani para peneliti untuk mempublikasikan hasil penelitian di bidang ilmu teknik dan teknik industri mencakup proses ...