International Journal of Sustainable Building, Infrastructure and Environment
Vol 6, No 1 (2025)

Cost and Time Control Analysis in the Neucentrix Building Renovation Project Using the Earned Value Method

Pinuji, Putri (Unknown)
Suwandi, Putri Anggi Permata (Unknown)
Rizani, Mohammad Debby (Unknown)



Article Info

Publish Date
25 Apr 2025

Abstract

In the Neucentrix renovation project, an addendum caused an extension. This study analyzes the weekly performance of the 2023 Neucentrix Pugeran Yogyakarta Project in terms of cost and time using the Earned Value method. The data analyzed using the Earned Value method using ACWP, BCWS, and BCWP indicators. From these indicators, CV, SV, CPI, SPI, EAS and EAC values are obtained. The analysis reveals cost savings from the first to the seventeenth week, with initial acceleration in the first four weeks followed by delays from weeks five to seventeen. The project is expected to take 19 weeks to complete, with a final estimated cost of IDR 2,294,673,540.

Copyrights © 2025






Journal Info

Abbrev

ijosbie

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

International Journal of Sustainable Building, Infrastructure, and Environment (IJOSBIE) is a peer-reviewed open-access international scientific journal who aims to provide an international platform for researchers, professionals, lecturer, and educational practitioners on all topics related to ...