Construction Project Scheduling Optimization with Critical Path Method (CPM) and Precedence Diagram Method (PDM) (Case Study: PT Samara Insan Sentosa)

Aji, Nuke Maheswara (Unknown)
Nindiani, Aina (Unknown)
Tri Sasmi, Weni (Unknown)
Fadli Perdana, Mohammad (Unknown)



Article Info

Publish Date
30 Jun 2025

Abstract

Delays in construction projects often occur due to suboptimal scheduling, which results in increased costs and decreased efficiency. PT Samara Insan Sentosa faces a similar problem, where the planned project duration does not match the realization in the field. This study aims to optimize project scheduling using the Critical Path Method (CPM) and Precedence Diagram Method (PDM). The research methods used include secondary data analysis, interviews, and scheduling calculations with both methods. The results of the study show that CPM and PDM can identify critical paths and optimize project completion duration. A comparison of the two methods shows that PDM is more flexible than CPM, with a shorter project completion duration. Implementation of the PDM method can reduce project completion time without sacrificing the quality of work. The conclusion of this study is that scheduling optimization using the right method can increase project efficiency and reduce the risk of delays. The impact of this study can help companies improve the effectiveness of project management.

Copyrights © 2025






Journal Info

Abbrev

sitekin

Publisher

Subject

Control & Systems Engineering Decision Sciences, Operations Research & Management Economics, Econometrics & Finance Industrial & Manufacturing Engineering Other

Description

Sesuai dengan standard ISO 45001 bahwa karyawan harus berpartisipasi dalam melakukan pencegahan kecelakaan. Untuk itu perusahaan telah menetapkan Program Hazob (Hazard Observation) untuk mengidentifikasi bahaya dan melakukan tindakan koreksinya. Penerapan Program Hazob masih dengan metode ...