Jurnal Rekayasa dan Manajemen Sistem Industri
Vol 4, No 8 (2016)

PENJADWALAN MULTI PROYEK FABRIKASI BOILER MENGGUNAKAN CRITICAL CHAIN PROJECT MANAGEMENT

Sinaga, Ruth Melly Sari (Unknown)
Sugiono, Sugiono (Unknown)
Hamdala, Ihwan (Unknown)



Article Info

Publish Date
24 Aug 2016

Abstract

Jika membutuhkan abstrak atau isi jurnal silahkan menghubungi author melalui email ruthmelly94@gmail.com, sugiono_ub@ub.ac.id, ihwan.h@ub.ac.id Terima kasih    

Copyrights © 2016