Jurnal Teknik Industri Terintegrasi (JUTIN)
Vol. 8 No. 3 (2025): July

Optimasi Proses Produksi Beton Ready Mix untuk Meminimalisir Waste pada Material di Batching Plant PT. X Gorontalo dengan Metode Lean Manufacturing

Bone, Kurniawan (Unknown)
Uloli , Hendra (Unknown)
Simatupang, Rudolf (Unknown)



Article Info

Publish Date
15 Jul 2025

Abstract

In the manufacturing industry, a company's productivity can be seen from its ability to run production processes effectively and efficiently. The problem of inefficient production occurs in the production process, which makes the production time longer and does not meet the targets. This forces operators to work overtime, and the company has to incur additional costs for the overtime operators. This research aims to identify waste and the impacts that affect production cost losses. Several waste factors that have a dominant impact on production cost losses have been identified. The result of this study is a change in the cycle time from before the improvement, which was 21,600 seconds or 360 minutes. After improvements were made to activities that caused waste, the cycle time of the ready-mix concrete production process became 18,600 seconds or 310 minutes.

Copyrights © 2025






Journal Info

Abbrev

jutin

Publisher

Subject

Decision Sciences, Operations Research & Management Energy Engineering Industrial & Manufacturing Engineering Mechanical Engineering

Description

Jurnal Teknik Industri Terintegrasi merupakan jurnal yang dikelola oleh Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Pahlawan Tuanku Tambusai yang menjebatani para peneliti untuk mempublikasikan hasil penelitian di bidang ilmu teknik dan teknik industri mencakup proses ...