Analysis of Implementation Time Performance Using Earned Value Method

Pontan, Darmawan (Unknown)
Daniel, Daniel (Unknown)
Pentagon, Pentagon (Unknown)
Manisha, Manisha (Unknown)
Sumeru, Indrawati (Unknown)



Article Info

Publish Date
06 Oct 2025

Abstract

Construction projects often face cost and time constraints, while projects are required to be completed on schedule. To overcome these problems, an accurate management system is needed in a construction project to measure time performance, which refers to the progress of the work. By applying the earned value management (EVM) method, it is possible to project progress and weekly performance indices, making it easier to evaluate when there are deviations from the schedule. This study aims to analyze schedule variations and weekly time productivity, enabling the prediction of when the project will be completed. In the construction project of the Faculty of Law Building at Samratulangi University in North Sulawesi Province, reviews were conducted in weeks 1, 5, 10, 11, 20, and 25, where each review period had different CV, SV, and CPI values, allowing to assess at which time the predicted time was closest to the actual time occurring on-site.

Copyrights © 2025






Journal Info

Abbrev

JournalLaMultiapp

Publisher

Subject

Aerospace Engineering Automotive Engineering Chemical Engineering, Chemistry & Bioengineering Civil Engineering, Building, Construction & Architecture Engineering

Description

International Journal La Multiapp peer reviewed, open access Academic and Research Journal which publishes Original Research Articles and Review Article, editorial comments etc in all fields of Engineering, Technology, Applied Sciences including Engineering, Technology, Computer Sciences, Architect, ...