Maritime Park: Journal Of Maritime Technology and Socienty
Volume 4, Issue 3, 2025

Redisigning the Construction of Graving Dock Gate to Get a More Optimal Design

Suci, Indah Melati (Unknown)
Alamsyah (Unknown)
Nurcholik, Samsu Dlukha (Unknown)
Martinus (Unknown)
Alie, Muhammad Zubair Muis (Unknown)



Article Info

Publish Date
12 Oct 2025

Abstract

The graving dock gate is one part of the graving dock construction. the construction of the graving dock gate that is directly facing the sea must be able to withstand the load from the water at all times. by making modifications to the Gate construction, the design results are obtained which are quite optimal in terms of weight strength. the redesign of the graving dock Gate pt.barokah galangan perkasa cannot be separated from a problem where the previous construction design was too heavy and exceeded the required laden. Causing the graving dock gate to not be able to float when the water conditions are low. The main size of the graving dock gate pt.barokah galangan perkasa is 3 meters long, 46 meters wide, 7.32 meters high. the method used in this redesign process is to use the e application of the finite element method ANSYS apdl, while 3d modeling uses SketchUp, and AutoCAD.

Copyrights © 2025






Journal Info

Abbrev

maritimepark

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Control & Systems Engineering Environmental Science Industrial & Manufacturing Engineering Mechanical Engineering

Description

Isu maritim menjadi fokus utama dunia, hal ini tidak lepas dari bumi kita yang memiliki sekitar 70 persen luas lautan. Jadi penelitian tentang kemaritiman merupakan investasi jangka panjang karena memakan biaya yang banyak dan waktu yang lama, barulah dapat terlihat manfaatnya. Untuk itu, penelitian ...