KOLONI
Vol. 4 No. 3 (2025): SEPTEMBER 2025

Analisis Pengaruh Contract Change Order (CCO) Terhadap Waktu Pelaksanaan Proyek Pembangunan Ruang Kelas Baru (RKB) Madrasah Tsanawiyah Negeri 6 Maluku Tengah

Romroma, Deske (Unknown)
Saleh, La Mohamat (Unknown)
Marantika, Meyke (Unknown)



Article Info

Publish Date
30 Sep 2025

Abstract

Construction projects are one of the activities that have a certain period of time. However,The purpose of this study is to obtain what factors affect the Contract Change Order (CCO) on the implementation time and find out the presentation of the influence of free variables on the implementation time of the New Classroom Construction (RKB) project of Madrasah Tsanawiyah NEGERI 6 Central Maluku. The analysis method used in this study is with the help of the SPSS program version 20. In the New Classroom Construction Project (RKB) Madrasah Tsanawiyah NEGERI 6 Central Maluku there are several factors that affect the contract change order on the implementation time. Among them are construction factors, administrative factors, resources, natural events and the presentation of the influence of independent variables on implementation time, which is 83.4% and the remaining 16.6% is influenced by other variables that were not tested in this study

Copyrights © 2025






Journal Info

Abbrev

koloni

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Law, Crime, Criminology & Criminal Justice Public Health Social Sciences Other

Description

KOLONI adalah jurnal multidisiplin ilmu yang diterbitkan oleh Universitas Pahlawan Tuanku Tambusai. Jurnal KOLONI terbit setiap 3 bulan merupakan jurnal peer review, open access, ilmiah dan ilmiah yang menerbitkan makalah penelitian, makalah review, laporan kasus, studi kasus, resensi buku, tesis, ...