Jurnal Riset Rumpun Ilmu Teknik (JURRITEK)
Vol. 4 No. 3 (2025): Desember : Jurnal Riset Rumpun Ilmu Teknik

Evaluasi Kinerja Simpang Tak Bersinyal Dengan Pulau Lalu Lintas di Kota Pontianak: Studi Kasus : Persimpangan Jl. Tebu-Jl. Tabrani Ahmad

Muhammad Dzulfikar Andika Satriatama (Unknown)
Elsa Tri Mukti (Unknown)
S. Nurlaily Kadarini (Unknown)



Article Info

Publish Date
02 Sep 2025

Abstract

The increase in traffic volume in urban areas often triggers various problems, especially at Road intersection points that have a high level of interaction between vehicles. One of the locations that experience these problems is the intersection with the island of traffic without signal on Jl. Tebu-Jl. Tabrani Ahmad, City Of Pontianak. This study aims to analyze the performance of the intersection in the existing condition and project its performance in the next five years (2030), as well as formulate alternative treatment that can improve the smoothness of traffic. The analysis method refers to Indonesian road capacity guidelines (PKJI) 2023 and modeling using software PTV VISSIM. The data collected include intersection geometry, traffic volume, and vehicle speed. Traffic volumes were obtained through CCTV recordings for three consecutive days, then processed and presented in the form of tables and graphs for easy interpretation. The results of the existing condition analysis showed that the degree of saturation (DS) reached 0.407 with an average delay of 9.539 seconds (Level of Service/LOS B) based on PKJI, while VISSIM simulation resulted in a delay of 12.54 seconds (LOS B). The five-year projection (2030) shows an increase in DS to 0.878 with a delay of 15.177 seconds (LOS C) from PKJI, and 23.35 seconds (LOS C) from VISSIM, which indicates a decrease in Junction performance as traffic grows. Two handling alternatives were analyzed, namely the construction of roundabouts and the implementation of traffic flow management. VISSIM simulation shows that the roundabout can reduce the delay to 14.31 seconds with a queue length of 20.34 m (LOS B), while the flow management produces a delay of 11.81 seconds with a queue of 13.14 m (LOS B). This result confirms that both alternatives are able to improve the performance of the intersection compared to the projected condition without handling, so that it can be a technical recommendation for urban traffic planning in Pontianak.

Copyrights © 2025






Journal Info

Abbrev

JURRITEK

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Computer Science & IT

Description

Sub Rumpun TEKNIK SIPIL DAN PERENCANAAN TATA RUANG 1. Teknik Sipil 2. Teknik Lingkungan 3. Rancang Kota 4. Perencanaan Wilayah dan Kota 5. Teknik Pengairan 6. Teknik Arsitektur 7. Teknologi Alat Berat 8. Transportasi 9. Bidang Teknik Sipil Lain Yang Belum Tercantum Sub Rumpun ILMU KETEKNIKAN ...