Serambi Engineering
Vol. 11 No. 1 (2026): Januari 2026

Implementasi Total Productive Maintenance sebagai Upaya Peningkatan Efektivitas dan Pencegahan Breakdown Mesin Multi Pack PT PCI  dengan Analisis Data

Muhammad Rizki Fitridiansyah (Unknown)
Rusindiyanto (Unknown)



Article Info

Publish Date
10 Jan 2026

Abstract

This study discusses the implementation of Total Productive Maintenance (TPM) as an effort to increase effectiveness and prevent breakdowns on Multi Pack Machines at PT PCI. During the observation process, it was found that the downtime duration was still quite high and affected the smooth production. Based on the recapitulation results using Microsoft Excel, the total downtime on the Multi Pack Machine PL 2 reached 555 minutes, which indicates the need for an evaluation of the current maintenance pattern. Through the implementation of TPM pillars, specifically Autonomous Maintenance, Planned Maintenance, and Quality Maintenance, this study highlights the importance of operator and maintenance team involvement in maintaining stable machine conditions. Downtime data was then analyzed using Excel to identify dominant causes through Pareto diagrams and root cause analysis. The results showed that several main factors causing disruptions could be clearly mapped so that corrective actions could be directed more precisely. The implementation of TPM was proven to be able to reduce the potential for recurrent damage and contribute to increasing the machine's OEE value.

Copyrights © 2026






Journal Info

Abbrev

jse

Publisher

Subject

Earth & Planetary Sciences Energy Engineering Environmental Science Industrial & Manufacturing Engineering

Description

The Serambi Engineering journal is published as a medium to distribute information on research results in engineering and science, both carried out by lecturers from the Serambi Mekkah University and other parties. Published research can be in the form of field research or laboratory research as ...