Jurnal Teknik Industri Terintegrasi (JUTIN)
Vol. 9 No. 1 (2026): January

Implementasi Value Stream Mapping (VSM) untuk Mengurangi Waste dalam Produksi Precast di CV. ABC

Alfan, Muhammad (Unknown)
Hamidah, Nur (Unknown)



Article Info

Publish Date
03 Jan 2026

Abstract

CV. Abc is a company that produces precast concrete. By using the Value Stream Mapping (VSM) method, which is a visualization method used in Lean Manufacturing to identify, analyze and improve the flow of material and information in a production process. This research aims to evaluate how wasteful precast concrete products are. CV. Abc works in the field of infrastructure development, especially irrigation and making products such as U-dith, Box Culvert, and Cover. The results of the research were carried out by dividing 7 waste into 7 types of waste based on the level of importance and performance. This research found that there is waste that needs to be corrected, especially related to visual defects on the product surface. Recommendations for improvement include better waste control, better finishing processes, and more efficient production processes. It is hoped that the implementation of these measures will increase customer satisfaction and increase the company's competitiveness in the construction market.

Copyrights © 2026






Journal Info

Abbrev

jutin

Publisher

Subject

Decision Sciences, Operations Research & Management Energy Engineering Industrial & Manufacturing Engineering Mechanical Engineering

Description

Jurnal Teknik Industri Terintegrasi merupakan jurnal yang dikelola oleh Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Pahlawan Tuanku Tambusai yang menjebatani para peneliti untuk mempublikasikan hasil penelitian di bidang ilmu teknik dan teknik industri mencakup proses ...