Journal of Engineering and Scientific Research (JESR)
Vol. 7 No. 2 (2025)

Investment Analysis of Heavy Equipments for Cut and Fill Work on Toll Road Construction Project : (Case Study: Trans Sumatra Toll Road Section 3, Bakauheni-Terbanggi Besar)

Kustiani, Ika (Unknown)
Syahputra, Reyzanza Anandio (Unknown)
Dasaputra, Andius (Unknown)



Article Info

Publish Date
10 Dec 2025

Abstract

Toll roads are vital infrastructure; however, their construction requires significant capital expenditures. One significant cost component is the cost of heavy equipment. The investment schemes considered in this study are cash new purchase, leasing, and rental. The best investment decision requires engineering investment analysis, including the NPV, IRR, BCR, and PP methods. The estimated cost of owning heavy equipment with a cash scheme is Rp 46.06 billion, a leasing scheme is Rp 53.50 billion, and a rental scheme is Rp 66.66 billion. The operating cost for all schemes is the same, amounting to Rp 56.44 billion during the construction period. The financial analysis results show that the cash scheme is the best with an NPV of Rp 9,198 billion, an IRR of 10.39%, a BCR of 1.12, and a PP of 3,3 years. Sensitivity analysis to interest rate increases shows that the cash scheme is feasible up to a 10% interest rate.

Copyrights © 2025






Journal Info

Abbrev

ojs

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Computer Science & IT Control & Systems Engineering Engineering Industrial & Manufacturing Engineering

Description

The focus and scopes of JESR is on but not limited to Mechanical Engineering and Material Sciences, Chemical and Environmental, Industrial and Manufacturing Engineering, Computer and Information Technology, Electrical and Telecommunication, Civil and Geodetic Engineering, Architecture and Urban ...